/
Survey Status
Survey Status Info
AYDIN MAMEDOV
GENERAL INFO
Ship Name:
AYDIN MAMEDOV
TL Register Number:
G-2237
Vessel Status:
IN CLASS
/
IN SERVICE
IMO No:
8613774
Flag:
THE REPUBLIC OF AZERBAIJAN
Call Sign:
4JKO
Port Of Registry:
BAKU
Ship Type:
CRANE VESSEL
GMDSS Navigation Area:
A1
SHIP OWNER
Ship Owner:
AZERBAIJAN CASPIAN SHIPPING - CLOSED JOINT-STOCK COMPANY
Address:
AZ 1027, Bakı şahari, abilov küçasi 25 BAKU
Fax No:
99412 493 5339
E-Mail:
rashad.goyushov@asco.az
Phone:
99412 498 9423
SHIP MANAGER
Manager:
Address:
Fax No:
E-Mail:
Phone:
CLASS NOTATION
Hull:
[+] 1A5 K20 AZ-Domestic Service ICE-B1 PONTOON CRANE
Machinery:
[+] M ICE-B1
MAIN DIMENSIONS
Lenght Between Parpendiculars (Lbp):
60
m
Breath Moulded:
15
m
Moulded Depth:
4
m
Summer Freeboard (d):
1110
mm
Gross Tonnage (GT):
1387
Net Tonnage (NT):
416
Dwt:
10
t
CONSTRUCTION DETAILS
Keel Laying Date:
01.01.1988
Launching Date:
Building Date:
03.05.1989
ShipYard-Building Place-ShipYard-Building Place:
Stocznia Szczecinska im A Warskiego - Szczecin-Poland
Cargo Hold / Tank Count:
40
Continuous Machinery Survey:
false
EQUIPMENT
Anchor Weight:
6750
kg
Cable Length:
220
m
Cable Quality:
K2
Cable Diameter mm.:
36
mm
Anchor Number:
2
MACHINERY
Propelling Type:
Internal Combustion Engine
Description
Manufacturer
Type
Serial No
Power
Revulation
Main Engine Nr.1
H.CEGIELSKI-SULZER
8AL20D
51
559.0 kW
/
760.0 BHp
750 rpm
Main Engine Nr.2
H.CEGIELSKI-SULZER
8AL20D
52
559.0 kW
/
760.0 BHp
750 rpm
Description
Manufacturer
Type
Serial No
Power
Revulation
Aux Engine (D/G Nr.1)
H.CEGIELSKI
6AL20/24
875
420.0 kW
750 rpm
Aux Engine (D/G Nr.2)
H.CEGIELSKI
6AL20/24
876
420.0 kW
750 rpm
Aux Engine (D/G Nr.3)
REMDIESEL
P2-50/1500-PA1143-1
1211297
50.0 kW
1500 rpm
Description
Manufacturer
Type
Serial No
Power (kVA)
Voltage/Frequency
Alternator (D/G Nr.1)
DOLMEL
GD8-500-50/6
13602204
500.0 kVa
400 V
/
50 Hz
Alternator (D/G Nr.2)
DOLMEL
GD8-500-50/6
13602205
500.0 kVa
400 V
/
50 Hz
Alternator (D/G Nr.3)
1FC2 222-4SB43P
212707039
65.0 kVa
400 V
/
50 Hz
Propeller Shaft (Oil Lub. Closed)
(Flanged)
AFT-PORT
Propeller Shaft (Oil Lub. Closed)
(Flanged)
AFT-STBD
CLASSIFICATION CERTIFICATES
Certificate Name
Issue Date
Expire Date
Extend
Certificate Type
Certificate of Class
03.02.2026
06.11.2029
-
Full Term
* Certificate was issued by Administration.
FLAG CERTIFICATES
Certificate Name
Issue Date
Expire Date
Extend
Certificate Type
International Load Line Certificate (1966)
03.02.2026
06.11.2029
-
Full Term
Cargo Ship Safety Construction Certificate
03.02.2026
06.11.2029
-
Full Term
Cargo Ship Safety Equipment Certificate
03.02.2026
06.11.2029
-
Full Term
Cargo Ship Safety Radio Certificate
03.02.2026
06.11.2029
-
Full Term
International Oil Pollution Prevention Certificate (Type A)
03.02.2026
06.11.2029
-
Full Term
Short Term International Sewage Pollution Prevention Certificate
03.02.2026
31.12.2026
-
Short Term
Statement of Compliance for Garbage Pollution Prevention
03.02.2026
06.11.2029
-
Full Term
International Air Pollution Prevention Certificate
03.02.2026
06.11.2029
-
Full Term
International Energy Efficiency Certificate
03.02.2026
-
Full Term
International Anti-Fouling System Certificate
03.02.2026
-
Full Term
Register of Lifting Appliances and Cargo Handling Gear
01.02.2025
31.01.2030
-
Full Term
ILO 152 Certificate of Test and Thorough Examination of Lifting Appliancess
01.02.2025
31.01.2030
-
Full Term
* * Survey was carried out by Losing Society.
PERIODIC CLASS SURVEYS
Survey Name
Last Survey
Next Survey
Survey Range
Postponed
Status
Class Renewal Survey - Hull
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Class Renewal Survey - Machinery
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Class Intermediate Survey
23.12.2022
06.11.2027
06.08.2026
-
06.02.2028
-
Class Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Bottom Survey - Dry Dock -
06.02.2025
05.02.2028
05.02.2028
-
06.02.2028
-
Bottom Survey - In Water -
23.12.2022
-
-
-
Propeller Shaft (Oil Lub. Closed) Survey Method 1 (Flanged) Aft-Port
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Propeller Shaft (Oil Lub. Closed) Survey Method 1 (Flanged) Aft-Stbd
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
NOTE: Renewal Survey may be commenced at the 4th Annual Survey and be programmed with a view to completion by the 5th annual date.
ISPS AUDITS
No Record Found...
ISM AUDITS
No Record Found...
MLC INSPECTIONS
No Record Found...
* Survey was carried out by Losing Society or Administration.
STATUTORY SURVEYS
Survey Name
Last Survey
Next Survey
Survey Range
Postponed
Status
Load Line Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Load Line Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Cargo Ship Safety Construction Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Cargo Ship Safety Construction Intermediate Survey
23.12.2022
06.11.2027
06.08.2026
-
06.02.2028
-
Cargo Ship Safety Construction Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Cargo Ship Safety Equipment Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Cargo Ship Safety Equipment Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Cargo Ship Safety Equipment Periodical Survey
23.12.2022
06.11.2027
06.08.2026
-
06.02.2028
-
Cargo Ship Safety Radio Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Cargo Ship Safety Radio Periodical Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Marpol Annex I Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Marpol Annex I Intermediate Survey
23.12.2022
06.11.2027
06.08.2026
-
06.02.2028
-
Marpol Annex I Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
Marpol Annex IV Renewal Survey
06.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Marpol Annex VI Renewal Survey
13.02.2025
06.11.2029
06.08.2029
-
06.11.2029
-
Marpol Annex VI Intermediate Survey
23.12.2022
06.11.2027
06.08.2026
-
06.02.2028
-
Marpol Annex VI Annual Survey
03.02.2026
06.11.2026
06.08.2026
-
06.02.2027
-
Due 3 Months
ILO 152 Cargo Gear Quinquennial Load Test
09.06.2021
31.01.2030
-
-
ILO 152 Cargo Gear Quinquennial Thorough Examination
01.02.2025
31.01.2030
-
-
ILO 152 Cargo Gear Annual Thorough Examination
03.02.2026
02.02.2027
-
-
Due 3 Months
CONTINUOUS MACHINERY SURVEYS
No Record Found...
Executing...